Download SAP Certified Application Associate - Production - Planning & Manufacturing with SAP ERP 6.0 EHP5.C_TSCM42_65.Exam-Files.2015-10-26.80q.vcex

Vendor: SAP
Exam Code: C_TSCM42_65
Exam Name: SAP Certified Application Associate - Production - Planning & Manufacturing with SAP ERP 6.0 EHP5
Date: Oct 26, 2015
File Size: 315 KB

How to open VCEX files?

Files with VCEX extension can be opened by ProfExam Simulator.

ProfExam Discount

Demo Questions

Question 1
What is a feature of the simu-lation mode for material requirements planning in SAP ECC?
  1. It posts planning results to the database automatically.
  2. It propagates exception messages from a component to the finished product.
  3. It calculates the delay time which may occur in planning.
  4. It triggers multilevel bottom-up scheduling.
Correct answer: C
Question 2
Which of the following functions does SAP Supply Chain Management (SCM) offer?
  1. Planning and optimization of supply chains across company boundaries.
  2. Optimization of the procurement strategy with the supplier pool.
  3. Product development, safety, quality, and maintenance.
  4. Communication to customers through different interaction channels.
Correct answer: A
Question 3
What sequence do you follow in master data maintenance to define the production of a material?
  1. Create BOM -> Create work centers -> Create routing -> Carry out component assignment in BOM or routing
  2. Create BOM -> Create work centers -> Create routing -> Carry out component assignment in work center
  3. Create routing -> Create work centers -> Create BOM -> Carry out component assignment in BOM or routing
  4. Create work centers -> Create routing -> Create BOM -> Carry out component assignment in work center
Correct answer: A
Explanation:
appropriate answer.
appropriate answer.
Question 4
In what sequence are the steps of material requirements planning performed in SAP ECC?
  1. 1. Net requirements calculation2. Lot sizing3. Scheduling4. Determination of the procurement type
  2. 1. Calculation of safety stock2. Lot sizing3. Scheduling4. Determination of the procurement type
  3. 1. Net requirements calculation2. Lot sizing3. Determination of the procurement type4. Scheduling
  4. 1. Availability check2. Lot sizing3. Determination of the procurement type4. Scheduling
Correct answer: C
Question 5
In SAP ECC, you calculate the standard available capacity for a work center capacity using the following data:
- Start: 7:00:00 a.m.
- End: 3:00:00 p.m.
- Break duration: 1 hour
- Rate of utilization: 80%
- Overload: 110%
- Number of individual capacities: 1
How large is the standard available capacity?
  1. 7 hours
  2. 6.16 hours
  3. 5.6 hours
  4. 8 hours
Correct answer: C
Question 6
For which of the following objects can you enter a confirmation? (Choose two)
  1. Production order
  2. Production order operation
  3. Trigger Point
  4. Work Center
Correct answer: AB
Question 7
When modeling in-house production using SAP ECC, on which business levels can you create a bill of material (BOM)? (Choose two)
  1. At the client level
  2. At the plant level
  3. At the company code level
  4. At the business area level
Correct answer: AB
Question 8
What could be a consequence of the confirmation of an operation?
  1. Settlement of the actual costs
  2. Reduction of capacity requirements
  3. Rescheduling of the production order
  4. Update of the planned costs
Correct answer: B
Question 9
In which master data object do you set the standard values for an operation?
  1. Work Center
  2. Production Resource/Tool (PRT)
  3. Material Master
  4. Routing
Correct answer: D
Question 10
You maintained the planning strategy group 10 (make-to-stock production) in the material master (SAP ECC) of a material. For the coming months you have planned requirements with requirement type LSF (derived from the main strategy 10). Now, you want to change the requirement type from LSF to VSF (in accordance with planning strategy 40, planning with final assembly) for requirements in the existing production plan.
Which of the following statements are applicable in this case? (Choose two)
  1. You can enter the strategy group 40 in the material master and change the present requirement for the product manually in the production plan.
  2. You must change the requirement type for planning strategy 10 to VSF in Customizing. The requirement type for all existing requirements is then changed by the next planning run.
  3. You can change the strategy group from 10 to 40 for the existing production plan in the material master, and the requirement type for all requirements is changed automatically.
  4. You can enter the strategy group 40 in the material master, but the requirement type is not changed automatically for existing requirements.
Correct answer: AD
Explanation:
most reliable answer.
most reliable answer.
HOW TO OPEN VCE FILES

Use VCE Exam Simulator to open VCE files
Avanaset

HOW TO OPEN VCEX AND EXAM FILES

Use ProfExam Simulator to open VCEX and EXAM files
ProfExam Screen

ProfExam
ProfExam at a 20% markdown

You have the opportunity to purchase ProfExam at a 20% reduced price

Get Now!